About The School
1701 East Lyon Station Road Creedmoor, NC 27522
To keep up with student demand, Falls Lake Academy added additional class space. They began accepting additional students for the 2018 – 2019 school year and serve students in grades K – 12. Hubrich Contracting handled the construction for the entire campus, including the main building and the high school, each with its own gym and a soccer field.
- Built to Class A standards
- Institutional grade precast exterior concrete panels
- Commercial grade storefront aluminum exterior windows and doors
- 20,000 square feet expansion
- Three 60-ton and three 50-ton Carrier DX Mechanical rooftop HVAC units
- 2 x 2 ceiling tile
- Plumbing fixtures per code requirements
- 26-acre building site
- Fully sprinkled fire protection with an expandable panel
- Fire Alarm system
- Solid surface cultured marble bathroom countertops





