Falls Lake Academy High

About The School

1701 East Lyon Station Road Creedmoor, NC 27522

Falls Lake Academy High is a project-based learning charter school. They began accepting students for the 2018 – 2019 school year and serve students in grades K – 12. Hubrich Contracting handled the construction for the entire campus, including two main buildings, each with its gym. Additional class space was added on to the school, along with a soccer field. To accommodate the school’s expedited opening, Hubrich designed a temporary space on the athletic fields of the permit site and coordinated access around the construction so that the project schedule was not affected.

  • Built to Class A standards
  • Institutional grade precast exterior concrete panels
  • Commercial-grade storefront aluminum exterior windows and doors
  • Gymnasium, atrium, classrooms, admin space, chemistry, biology and earth science labs
  • Plumbing fixtures per code requirements
  • 26-acre building site
  • Fully sprinkled fire protection with an expandable panel
  • Fire Alarm system
  • Solid surface cultured marble bathroom countertops

Build dynamic learning environments with Hubrich Contracting. Our experienced team creates educational legacies tailored to your community's needs.
Partner with us today for lasting impact.